London Jeans

Vintage Eagle Automatic, Mirado Semaphore, Onward & Diana long leads

Description: For those who appreciate vintage mechanical pencils, this lead lot is a must-have. The collection includes Vintage Eagle Automatic, Mirado Semaphore, Onward and Diana long leads. These leads were made in the United States and are made of high-quality graphite, making them a great addition to any writing collection. The set is ideal for collectors of vintage mechanical pencils, as well as for those who enjoy the nostalgia of classic writing minutiae. Six boxes in all with leads in wood trays.

Price: 17 USD

Location: Lake City, Minnesota

End Time: 2024-12-26T22:02:19.000Z

Shipping Cost: 1 USD

Product Images

Vintage Eagle Automatic, Mirado Semaphore, Onward & Diana long leadsVintage Eagle Automatic, Mirado Semaphore, Onward & Diana long leadsVintage Eagle Automatic, Mirado Semaphore, Onward & Diana long leads

Item Specifics

All returns accepted: ReturnsNotAccepted

Material: graphite

Country/Region of Manufacture: United States

Vintage: Yes

Recommended

Vintage Crystal Bald Eagle Sculpture Catching Fish Amazing Details, 8" H. 6.5" W
Vintage Crystal Bald Eagle Sculpture Catching Fish Amazing Details, 8" H. 6.5" W

$25.00

View Details
Vintage 19" Brass American Eagle #7020 Spread Wings Wall Hanging Home Decor
Vintage 19" Brass American Eagle #7020 Spread Wings Wall Hanging Home Decor

$36.99

View Details
Vintage Flying Eagle Brass Wall Hanging Decor House Plaque 19" Lbs Heavy 3 Lb.
Vintage Flying Eagle Brass Wall Hanging Decor House Plaque 19" Lbs Heavy 3 Lb.

$32.95

View Details
Brass Eagle Solid Ingot HEAVY Vintage USA Americana 16 lbs
Brass Eagle Solid Ingot HEAVY Vintage USA Americana 16 lbs

$99.97

View Details
Vintage EAGLE Figurine on branch Heavy Metal Amazing Detail
Vintage EAGLE Figurine on branch Heavy Metal Amazing Detail

$39.95

View Details
Vintage Large Brass American Eagle 3D Wall Hanging-17" with mounting holes
Vintage Large Brass American Eagle 3D Wall Hanging-17" with mounting holes

$40.00

View Details
Vintage MBC American Eagle Wall Decor Japan 18 1/2 Inch
Vintage MBC American Eagle Wall Decor Japan 18 1/2 Inch

$12.00

View Details
Vintage  Large Brass Eagle Statue USA America Freedom Patriotic 15" Wingspan
Vintage Large Brass Eagle Statue USA America Freedom Patriotic 15" Wingspan

$70.00

View Details
Cast Iron American Eagle Wall Hanging 29 1/4 inch Wingspan Vintage
Cast Iron American Eagle Wall Hanging 29 1/4 inch Wingspan Vintage

$39.95

View Details
Vintage XTRA LARGE SOLID BRASS EAGLE STATUE SCULPTURE 24”WINGSPAN 21”TALL ,Heavy
Vintage XTRA LARGE SOLID BRASS EAGLE STATUE SCULPTURE 24”WINGSPAN 21”TALL ,Heavy

$300.00

View Details