London Jeans

PENCIL LEAD REFILL-.5mm - 5 TUBES X 20=100 -HB- EXTRA LONG LEAD-120 mm 4 1/2"

Description: PENCIL LEAD REFILL-.5mm- 5 TUBES X 20 -HB HARDNESS-EXTRA LONG LEAD-120mmEACH LEAD STICK IS 120mm OR ABOUT 4 1/2" LONG( almost 3x normal lead size)AT TemeculaPens WE STRIVE TO BRING TO OUR CLIENTS A QUALITY PRODUCT AT A REASONABLE PRICE . SO COME SHOP OUR E-BAY STORE AND SAVE ON QUALITY PENS AND SUPPLIES FOR PARKER AND WATERMAN PRODUCTS AT A FRACTION OF THE PRICE YOU'LL FIND IN RETAIL STORES.

Price: 8.99 USD

Location: Temecula, California

End Time: 2023-11-06T22:43:51.000Z

Shipping Cost: 0 USD

Product Images

PENCIL LEAD REFILL-.5mm - 5 TUBES X 20=100 -HB- EXTRA LONG LEAD-120 mm 4 1/2"PENCIL LEAD REFILL-.5mm - 5 TUBES X 20=100 -HB- EXTRA LONG LEAD-120 mm 4 1/2"

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Buyer

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Brand: Unbranded/Generic

Product Type: Pencils

MPN: Does Not Apply

Recommended

Bashful Demon Jewelry Vintage Silver Sexy Goddess Standing Pendant Necklace
Bashful Demon Jewelry Vintage Silver Sexy Goddess Standing Pendant Necklace

$12.99

View Details
Hematite Necklace with Cross Pendant
Hematite Necklace with Cross Pendant

$8.75

View Details
16” Silver Tone Clear Mermaid Scales Necklace
16” Silver Tone Clear Mermaid Scales Necklace

$3.41

View Details
K18 Leave In Molecular Repair Hair Mask Biomimetic Hairscience 50 ml / 1.7 oz
K18 Leave In Molecular Repair Hair Mask Biomimetic Hairscience 50 ml / 1.7 oz

$10.35

View Details
3xCrystal Holder Cage Necklace Set Stone Holder Necklace for Crystals Metal Net
3xCrystal Holder Cage Necklace Set Stone Holder Necklace for Crystals Metal Net

$12.79

View Details
Fit Ginger Snap Floral 18mm metal snap 18mm ZZD3870
Fit Ginger Snap Floral 18mm metal snap 18mm ZZD3870

$1.49

View Details
5pcs Amethyst stone Rose Pendants Chakra Reiki Healing Amulet Energy
5pcs Amethyst stone Rose Pendants Chakra Reiki Healing Amulet Energy

$16.99

View Details
Gold Pl Coin Centenario Mexicano Moneda 50 Pesos Pendant Chain Oro Cadena 26”
Gold Pl Coin Centenario Mexicano Moneda 50 Pesos Pendant Chain Oro Cadena 26”

$19.99

View Details
24,27,30,36,40 Inch Military Spec Stainless Steel Army Dog Tag 2.4mm Ball Chain
24,27,30,36,40 Inch Military Spec Stainless Steel Army Dog Tag 2.4mm Ball Chain

$4.25

View Details
Perlas Para Planificar
Perlas Para Planificar

$80.00

View Details