London Jeans

HeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2m

Description: This USB A to Type C cable is the perfect accessory for your mobile phone. It is compatible with a range of brands including Apple, Samsung, and Huawei. The cable is made from high-quality braided material and is designed for fast charging with a power output of 6A and 66W. The cable is available in two lengths, 1M and 2M, making it ideal for both short and long charging sessions. It features a USB-C connectivity and is suitable for use with a range of mobile phone types. The cable is supplied with a charging cable and is easy to use.

Price: 3.49 GBP

Location: Manchester

End Time: 2025-01-25T14:52:26.000Z

Shipping Cost: 16.92 GBP

Product Images

HeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2mHeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2mHeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2mHeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2mHeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2mHeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2mHeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2mHeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2m

Item Specifics

Return postage will be paid by: Buyer

Returns Accepted: Returns Accepted

After receiving the item, your buyer should cancel the purchase within: 30 days

Brand: Unbranded

Compatible Brand: Universal, For Apple, For ASUS, For Google, For Huawei, For Lenovo, For LG, For Nokia, For OnePlus, For OPPO, For Samsung, For Sony, For Xiaomi

Type: Type-C Cable

Items Included: Charging Cable

Connectivity: USB-C

Features: Braided

Material: braided

Available Variations

Color: 1 Meter

Price: 3.49 GBP

Available Quantity: 93

Quantity Sold: 47

Color: 1 Meter

Price: 3.49 GBP

Available Quantity: 174

Quantity Sold: 128

Color: 1 Meter

Price: 3.49 GBP

Available Quantity: 87

Quantity Sold: 56

Color: 2 Meter

Price: 3.95 GBP

Available Quantity: 114

Quantity Sold: 95

Color: 2 Meter

Price: 3.95 GBP

Available Quantity: 246

Quantity Sold: 204

Color: 2 Meter

Price: 3.95 GBP

Available Quantity: 128

Quantity Sold: 103

Recommended

Saquon Barkley #26 Penn State blue/white Jersey Men’s Size S-3XL
Saquon Barkley #26 Penn State blue/white Jersey Men’s Size S-3XL

$37.99

View Details
BRAD’S 2-Pack Super Bait Original UV “DOUBLE DIABLO” type Lure *RARE*
BRAD’S 2-Pack Super Bait Original UV “DOUBLE DIABLO” type Lure *RARE*

$26.99

View Details
Unbranded Socks Men's Gray New without Tags
Unbranded Socks Men's Gray New without Tags

$4.99

View Details
Monopoly Go All 1&2&3stars stickers❗read description❗
Monopoly Go All 1&2&3stars stickers❗read description❗

$1.35

View Details
Pack of 120, 25 mm Plastic Round Bases Miniature Wargames Table gaming TEXTURED
Pack of 120, 25 mm Plastic Round Bases Miniature Wargames Table gaming TEXTURED

$8.99

View Details
FEM, Power Gain And OML Plus Frutas, Free Shipping
FEM, Power Gain And OML Plus Frutas, Free Shipping

$110.00

View Details
Rope Scrape, Scrape Rope, Mock Scrape, Hemp Rope, Licking Branch (3/4” X 4’)
Rope Scrape, Scrape Rope, Mock Scrape, Hemp Rope, Licking Branch (3/4” X 4’)

$16.99

View Details
Multi Collagen Peptides Powder-Hydrolyzed Protein Peptides (Type l,l,ll,v,X)
Multi Collagen Peptides Powder-Hydrolyzed Protein Peptides (Type l,l,ll,v,X)

$36.99

View Details
Resin Printed Star Wars Ships in Armada scale
Resin Printed Star Wars Ships in Armada scale

$8.00

View Details
Blackfish Tog Porgy Seabass Trigger Jig Lure 2x Mustad Ultra Point Hook
Blackfish Tog Porgy Seabass Trigger Jig Lure 2x Mustad Ultra Point Hook

$2.75

View Details