London Jeans

2SB394 BLACK LONG LEADS

Description: TRAN PNP TO-5 2SB394

Price: 3 USD

Location: Boca Raton, Florida

End Time: 2023-12-11T18:33:24.000Z

Shipping Cost: N/A USD

Product Images

2SB394 BLACK LONG LEADS

Item Specifics

Item must be returned within: 14 Days

Refund will be given as: Money Back

Return shipping will be paid by: Buyer

Restocking Fee: No

All returns accepted: Returns Accepted

Return policy details:

Model: GERMANIUM TRAN PNP TRAN PNP TO-5

MPN: 2SB394

Country/Region of Manufacture: Japan

Brand: BOCASEMI

Recommended

 1N5256B DO-35 AXIAL ZENER DIODES 30V 500mW
1N5256B DO-35 AXIAL ZENER DIODES 30V 500mW

$2.00

View Details
MJE371 PNP SIL TO-126
MJE371 PNP SIL TO-126

$1.25

View Details
2N6732 PNP SIL TO-237
2N6732 PNP SIL TO-237

$1.50

View Details
( 10 PCS ) MJE800 Transistor TO-126 NPN 60V 4A 40W New *** USA SELLER ***
( 10 PCS ) MJE800 Transistor TO-126 NPN 60V 4A 40W New *** USA SELLER ***

$14.99

View Details
 2SA999 original transistor ECG NTE 290A PNP amp
2SA999 original transistor ECG NTE 290A PNP amp

$2.00

View Details
C434D 600A/400V INVERT. SCR. New
C434D 600A/400V INVERT. SCR. New

$60.00

View Details
2N5610 NPN SIL TO-66
2N5610 NPN SIL TO-66

$2.50

View Details
2N3036 S TRANSISTOR VINTAGE TO5           GOLD LEADS
2N3036 S TRANSISTOR VINTAGE TO5 GOLD LEADS

$2.00

View Details
Transistor 2N5563 SCA TO-18N-Channel JFET JFET, DUAL N-CH TO-71
Transistor 2N5563 SCA TO-18N-Channel JFET JFET, DUAL N-CH TO-71

$3.00

View Details
2n6693 NPN SIL HV ISOL TO-61
2n6693 NPN SIL HV ISOL TO-61

$7.00

View Details