London Jeans

18 each 6977 Amperex Tuning Indicator Tubes on a vintage PCB assembly long leads

Description: 18 each 6977 Amperex (Holland) Tuning Indicator Tubes on a vintage PCB assembly and they still have fairly long leads. Look closely at all the pictures. The tube leads are about 0.9 inches long. The tubes are on a custom printed circuit board coming from government/military surplus.The board originally had 20 tubes but 2 on one end are gone. FREE POSTAGE!!! We are experienced sellers on eBay since 1999. Please check our feedback and eBay rating 1) We will only ship your item to the eBay/PayPal confirmed address that is registered to your eBay/PayPal account. 2) Item is sold as described. Look at the pictures carefully, if its not in the pictures then it is probably NOT included. 3) We do want our customers to be happy. If there is a problem, contact us and we will work it out. Please, let us help with your concerns before contacting eBay or leaving feedback. 4) Returns: Books cannot be returned. Other than books, returns only by approved request, restocking fee may apply. 5) We gladly combine shipping on multiple orders and we will refund the excess postage. 6) We also accept payments through PayPal. 7) serial number of item has been documented or item has been marked. 8) Returns accepted with prior approval. Restocking fee may apply. Thanks for looking! Please visit Cyberquipment.com OR EdgarDigital.com to reach out and learn about our eBay sales and policies, more about us, and see many more interesting & odd items ★ª"˜¨¨★ª"˜¨¨¯¯¨¨˜ª¤.¸`*•.¸*•¸★☆☆★☆Five Stars☆★☆☆★¸•*¸.•*´¸.¤ª˜¨¨¯¯¨¨˜"ª★¨¨˜"ª★ Location: EB1 above Box 1

Price: 59 USD

Location: Las Cruces, New Mexico

End Time: 2025-01-28T01:07:55.000Z

Shipping Cost: N/A USD

Product Images

18 each 6977 Amperex Tuning Indicator Tubes on a vintage PCB assembly long leads18 each 6977 Amperex Tuning Indicator Tubes on a vintage PCB assembly long leads18 each 6977 Amperex Tuning Indicator Tubes on a vintage PCB assembly long leads18 each 6977 Amperex Tuning Indicator Tubes on a vintage PCB assembly long leads18 each 6977 Amperex Tuning Indicator Tubes on a vintage PCB assembly long leads18 each 6977 Amperex Tuning Indicator Tubes on a vintage PCB assembly long leads

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Buyer

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Non-Domestic Product: Holland

Brand: Amperex

Type: 6977

Custom Bundle: No

Model: 6977

Country/Region of Manufacture: United States

Modified Item: No

Recommended

Rare Amperex 845 - VT-43 brass base audio tube - Graphite Plate #2
Rare Amperex 845 - VT-43 brass base audio tube - Graphite Plate #2

$895.00

View Details
12AX7/ECC83 Amperex Bugle Boy Red Tip MaxiPreamp2/TV7 tested (1) tube lot
12AX7/ECC83 Amperex Bugle Boy Red Tip MaxiPreamp2/TV7 tested (1) tube lot

$179.99

View Details
Amperex 872ax Electron Tube
Amperex 872ax Electron Tube

$29.95

View Details
NEW OLD STOCK AMPEREX BUGLE BOY 12AU7 ECC82 HOLLAND ELECTRON VACUUM TUBES
NEW OLD STOCK AMPEREX BUGLE BOY 12AU7 ECC82 HOLLAND ELECTRON VACUUM TUBES

$100.00

View Details
6AJ8 / ECH81 Tube Amperex New (New Old Stock) Test NEW 1 Year Warranty
6AJ8 / ECH81 Tube Amperex New (New Old Stock) Test NEW 1 Year Warranty

$12.45

View Details
NOS Amperex 6FQ7 / 6CG7 Vacuum tube
NOS Amperex 6FQ7 / 6CG7 Vacuum tube

$29.99

View Details
NOS Amperex 6GU7 Vacuum Tube
NOS Amperex 6GU7 Vacuum Tube

$9.99

View Details
(2) Vintage Amperex 6AK5 5654 Vacuum Tubes Sencor 162 Tested
(2) Vintage Amperex 6AK5 5654 Vacuum Tubes Sencor 162 Tested

$25.00

View Details
Matched Pair Amperex 5654 6AK5 Vacuum Tubes Tested NOS ON TV - 7
Matched Pair Amperex 5654 6AK5 Vacuum Tubes Tested NOS ON TV - 7

$19.95

View Details
1 x 12AU7 ECC-82 Amperex Holland Short Plate  Tube - TV-7 Tested NOS
1 x 12AU7 ECC-82 Amperex Holland Short Plate Tube - TV-7 Tested NOS

$15.00

View Details